EICR in Southwark: the local picture
In Peckham and Walworth, electrical inspection can involve older flats with circuits altered during kitchen replacements or subdivision. Canada Water apartments may instead have clearly separated dwelling supplies and communal installations managed by different parties. Agree the EICR scope and access to the correct consumer unit before attendance. Peachtree Maintenance can organise inspection by an appropriately qualified person, keep the report with the property record and coordinate approved remedial work. A modern-looking finish is not evidence that the underlying installation is satisfactory.
What the rules say
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require landlords to have the fixed electrical installation inspected and tested by a qualified person at least every five years, or sooner if the report says so.
A copy goes to tenants within 28 days, and to the council within 7 days if it asks. Where the report shows remedial work is required (codes C1, C2 or FI), that work should be completed within 28 days or the shorter time stated, with written confirmation kept.
Districts we visit for eicr
Bermondsey, Rotherhithe, Canada Water, Peckham, Camberwell, Dulwich, Walworth, Elephant and Castle, Nunhead, Bankside, covering postcode districts SE1, SE5, SE15, SE16, SE17, SE21, SE22, SE24.