EICR for landlords: frequency, codes C1, C2, C3 and FI, and remedial deadlines

Understand when electrical inspections are due, what report codes mean and how to organise repairs, confirmation and tenant copies.

Last reviewed 20 October 2026Published 20 October 2026

Key takeaways

Ref EIC

  • Inspect at least every five years, or sooner if the report requires it.
  • C1 needs immediate safety action; C2 and FI also require follow-up.
  • C3 alone does not make an EICR unsatisfactory.
  • Complete required works within 28 days or the report’s shorter period.
  • Track report delivery and written confirmation separately from repairs.

What an EICR covers in England

An Electrical Installation Condition Report, usually shortened to EICR, records the results of inspecting and testing a property’s fixed electrical installation. For an in-scope rented home in England, the landlord arranges this through a qualified person and acts on the findings. It is not simply a certificate to purchase before advertising: the underlying requirement is to maintain electrical safety throughout occupation, with the report providing evidence about the installation’s condition.

The regulations generally cover rented homes occupied as the tenant’s only or main residence, including relevant licences to occupy. Exceptions include certain arrangements involving resident landlords, long leases, student halls and specified supported or institutional accommodation. An HMO is not automatically exempt. Where the arrangement is unusual, ask the council or a solicitor to check the actual tenancy against the regulations rather than relying on the property’s marketing description.

This guide is checked October 2026 and focuses on private landlords and letting agents in England. The regulations were extended to social housing in 2025, with transitional arrangements for older social tenancies. Those arrangements should not be treated as extra time for an existing private letting. GOV.UK guidance and the current legislation should be read together when deciding which duties apply to a particular home.

How often to arrange inspection and testing

The normal maximum interval is five years, but the report can require the next inspection sooner. Follow the earlier date where one is specified. Record the inspection date and the next inspection deadline separately, because adding five years to every report can produce the wrong result. A shorter interval may reflect the installation’s condition or circumstances, and should be discussed with the inspector rather than silently changed in the agent’s diary.

A change of tenant does not automatically require another full EICR where an existing report remains current and no investigative or remedial work is outstanding. GOV.UK recommends a visual check before a new tenancy to identify damage or deterioration since the previous inspection. Arrange professional investigation when that check or a tenant’s report raises concerns. A current date on paperwork is not a reason to ignore scorching, damaged fittings or repeated electrical faults.

For a newly built home or a complete rewire, an appropriate Electrical Installation Certificate can provide the relevant initial evidence. Government guidance describes circumstances where another inspection is not needed for five years after that certificate is issued, provided the other duties are met. A certificate for a small alteration is not equivalent to evidence for the whole installation. Ask the electrician to confirm the coverage before entering a portfolio-wide renewal date.

Choose a qualified inspector and prepare access

The inspection and testing should be carried out by a qualified person competent for this work. Ask specifically about experience in periodic inspection, reporting and the type of property involved, rather than assuming that someone who installs sockets necessarily offers the same service. Request evidence of relevant qualifications and insurance, and establish who will sign the report. Registration can help you assess a contractor, but the important question is competence for the inspection being commissioned.

Provide the previous report, certificates for subsequent work and details of known faults before the visit. Explain conversions, shared supplies, outbuildings and specialist systems such as solar panels or battery storage. Agree what the appointment covers and flag any inaccessible areas. The inspector should record the extent and limitations of the inspection; broad limitations that leave important parts unassessed deserve clarification before the report is accepted as suitable evidence for the property.

Explain the visit to tenants, including likely power interruptions and the need to access fittings and the consumer unit. Agree arrangements early enough to leave time for follow-up work. If access is refused, keep correspondence, offer reasonable alternatives and obtain advice about the next steps. The regulations recognise reasonable steps in specified circumstances, but a single unanswered message is not a dependable access strategy or an automatic exemption from arranging safety work.

Read the whole report, not just the outcome

The inspection concerns fixed wiring, sockets, light fittings, the consumer unit and permanently connected equipment such as showers and extractors. It looks for matters including electric shock risks, fire hazards, defective work, overloading and problems with earthing or bonding. An EICR is not a replacement for an appliance maintenance programme, a fire risk assessment or other property checks. Keep each inspection’s purpose clear when explaining the results to an owner or tenant.

Check the address, inspection date, overall assessment, next inspection date, observations and any limitations. Make sure the report belongs to the correct flat or house and that its extent matches the instruction. For an HMO or a converted building, ask the inspector to explain how private and shared installations have been covered. A report for one dwelling should not be casually filed as proof that every installation in the building was inspected.

An unsatisfactory assessment needs action, not merely another appointment in five years. Translate every observation into a tracked task with the code, location, required action, responsible person and deadline. If the wording is unclear, ask the reporting electrician to explain it promptly. Do not ask an agent or general maintenance operative to downgrade a code, and do not assume that obtaining a second quotation removes the need to address the original finding.

What C1, C2, C3 and FI mean

C1 means danger present, with a risk of injury. Treat this as an immediate safety issue and ask the electrician to make the hazard safe and explain any restrictions on use. GOV.UK notes that an inspector may make C1 hazards safe before leaving. Do not interpret the ordinary remedial deadline as permission to leave an identified immediate danger in service while quotations are compared or the owner considers a refurbishment budget.

C2 means potentially dangerous, requiring remedial work. FI means further investigation required without delay: the uncertainty needs resolving, rather than being filed as an optional recommendation. C1 and C2 findings make the installation unsatisfactory for continued use; FI also requires follow-up before the matter can be treated as resolved. Investigation may identify repairs that were not apparent initially, so allow for both diagnosis and any resulting work when organising access.

C3 means improvement recommended. A C3 observation alone does not require remedial work for the report to be satisfactory under this framework. It remains useful information for maintenance planning, especially where work can be combined sensibly with another project. Ask the inspector about priorities and practical benefits. Neither the age of a fitting nor a departure from the latest installation practice should be converted into a code by an unqualified property manager.

The 28-day deadline and shorter urgent periods

Where the report requires remedial work or further investigation, the regulations require completion within 28 days of the inspection and testing, or within the shorter period specified in the report. This is a completion requirement, not merely a deadline for requesting quotations. Read the actual time allowed immediately on receipt and ask for urgent findings to be communicated during the visit, so that report administration does not consume the available response time.

Book the appropriate electrician, agree how any immediate risk will be controlled and give the tenant clear instructions from the professional. Separate temporary making-safe measures from the permanent repair where both are needed. For FI, obtain the investigation outcome in writing and act on any further required work. The regulations also address subsequent investigative findings, so ask the qualified person to identify the next required action and deadline rather than assuming the first visit closes everything.

Complex work, supplier involvement or difficult access can affect delivery. Keep evidence of prompt instructions, appointments, communications and interim safety measures, and contact the council or a solicitor for advice where compliance is at risk. Current guidance recognises reasonable steps in specified circumstances, but contractor availability is not a blanket extension. Do not declare the property compliant merely because a repair is scheduled or because the owner has approved the quotation.

Get written confirmation and send the right documents

After required remedial or investigative work, obtain written confirmation from the qualified person that it has been carried out and whether the electrical safety standards are met or further action remains necessary. An invoice saying electrical repairs is not enough to explain that outcome. Depending on the work, appropriate documentation may include an Electrical Installation Certificate, a Minor Electrical Installation Works Certificate, a satisfactory EICR or other suitable electrical certification.

The report and written confirmation should be supplied to the tenant and the local council within 28 days of completion of the remedial or investigative work. This follow-up duty is distinct from supplying the original report on request. Set a separate reminder when the works finish, and check that the evidence describes the observations actually addressed. Keep any further investigation findings with the original report so that the sequence remains understandable.

A completely new EICR is not automatically the only way to document every repair. Agree the necessary certification with the qualified person, including how it links to the original observations and any remaining restrictions. Avoid editing the original inspection outcome yourself or substituting an agent’s assurance for professional confirmation. Preserve the original report alongside completion evidence, rather than deleting an unsatisfactory document and losing the record of how the defects were resolved.

Who receives the report and when

Existing tenants should receive a copy of the report within 28 days of the inspection and testing. A new tenant should receive it before occupying the premises. A prospective tenant who requests it should receive it within 28 days of the request. Build these steps into the inspection and move-in workflows, with a named person responsible for sending the complete document rather than only a front-page screenshot or appointment confirmation.

If the local council requests the report, the response period is seven days from receipt of the request. Record when the request arrived and send the relevant document through the requested route. A council enquiry should not sit in a general maintenance inbox awaiting the next inspection. Where the council also raises defects or enforcement concerns, read each requirement separately and seek advice if the scope or deadline is unclear.

Retain the report until the next inspection is required or, if later, conducted, unless a more recent report supersedes it. Give the next inspector a copy of the previous report. As practical record management, keep related completion evidence and delivery records together at address level. Agree how records will be handed over when agents change, so the owner does not discover that access to the only report ended with a management contract.

Keep appliance checks and changing rules separate

Portable appliance testing is not an EICR. HSE explains that there is no universal requirement for annual PAT under the Electricity at Work Regulations; inspection and testing depend on equipment and circumstances. This should not be turned into a claim that landlord-provided appliances need no attention. Assess their condition, respond to reported faults and arrange competent advice about appropriate maintenance, keeping appliance records separate from the fixed-installation report.

Social landlords have additional equipment-checking duties under the extended regulations, including checks at least every five years for equipment provided under the tenancy. Older social tenancies have transitional requirements for initial installation inspections and equipment checks before 1 November 2026. Private landlords should not copy these transitional dates into their own EICR calendars. Mixed portfolios need the landlord type and applicable arrangements recorded clearly for each property.

Checked October 2026: a draft 2026 amendment instrument proposes further changes, including updating the referenced electrical standard, with a stated commencement date of 30 November 2026. A draft is not evidence that every proposed provision is already operative. Check the final made instrument and commencement position before relying on those changes. Ask the electrician which technical requirements apply to the assessment, rather than assuming every older installation needs wholesale replacement.

Turn the findings into a managed safety programme

Use an address-level register showing the inspection date, next due date, outcome, outstanding observations, remedial deadlines and dates documents were supplied. Assign responsibility for checking incoming reports, not just ordering visits. Flag urgent findings immediately and review unresolved investigations regularly. Allow enough time before expiry for access problems and repairs, and link electrical work to planned maintenance only where that does not delay necessary safety action.

Councils can serve remedial notices, arrange remedial action in the circumstances set out in the regulations and recover costs. Financial penalties are also available. Treat any notice as a separate matter with its own response and appeal requirements; a contractor booking does not answer it. Seek prompt council clarification or solicitor advice about disputed findings, notices or penalties, while arranging professional action to control any identified electrical danger.

Peachtree Maintenance can help coordinate inspections, tenant access, appropriate remedial work and compliance records. The qualified electrician determines the technical findings and completion evidence; the council handles enforcement questions. For a busy landlord or letting agent, the aim is a traceable chain from inspection to action to confirmation, with the tenant informed throughout. A report is useful only when its findings lead to timely decisions and the next inspection is not forgotten.

Frequently asked questions

01

Can a tenant’s electrician change the report outcome?

A qualified person can inspect or carry out appropriate work, but an informal opinion does not amend the original report. Ask for signed findings and suitable completion evidence, and obtain professional advice if assessments conflict.

02

Does an empty property remove the need to address defects?

A void period is a useful opportunity to arrange work, not proof that an installation is safe. Resolve required findings and check the evidence before the next tenant occupies the home.

03

Should I accept a quotation based only on the overall result?

Ask for an itemised scope linked to the observations. An unsatisfactory label alone does not identify which repairs, investigation or certification the quotation includes.

04

Can I keep the report only in my agent’s portal?

A portal can work if the owner can retrieve the complete documents and delivery records. Arrange an export and handover process before changing agents or closing an account.

05

What should I tell a tenant about a C1 finding?

Pass on the electrician’s specific safety instructions promptly, including any equipment or circuit that should not be used. Do not attempt to explain away the danger or give DIY repair instructions.

Sources

About the author

Peachtree Maintenance compliance team

Written by the team that arranges certificates, inspections and repairs for Peachtree Maintenance clients. General information for England, not legal advice. Last reviewed 20 October 2026.

Hand it to us