Fire risk assessment in Westminster: the local picture
Fire arrangements for a Bayswater conversion differ from those for a modern block near Victoria. Establish which common areas and escape routes are within the assessment instruction and obtain existing building documents from the responsible person. In Soho, residential access beside or above commercial activity deserves particular attention when defining the premises. Peachtree Maintenance can coordinate fire risk assessment and maintenance actions arising from it. Altering a flat entrance door or a service route should be considered in the wider building context, not simply as a tenancy repair.
What the rules say
The Regulatory Reform (Fire Safety) Order 2005 requires the responsible person for common parts of multi occupied buildings, most HMOs and commercial premises to carry out a suitable fire risk assessment and keep it under review.
The Fire Safety Act 2021 confirmed this includes the building structure, external walls and flat entrance doors. Since October 2023 the full assessment must be recorded in writing. Reviews are expected regularly and after any significant change.
Westminster licensing
Westminster has renewed its borough-wide additional HMO licensing scheme, effective from 31 August 2026 until 30 August 2031. The council also states that selective licensing applies to qualifying non-HMO private rented properties in fifteen wards, with address coverage and exemptions to be checked separately.
Source: Westminster Council, last checked 2026-10-20.
Districts we visit for fire risk assessment
Marylebone, Mayfair, Soho, Pimlico, Paddington, Bayswater, Maida Vale, St John's Wood, Victoria, Westbourne Park, covering postcode districts W1B, W1D, W1F, W1G, W1H, W1J, W1K, W1S, W1U, W1W, W2, W9, NW1, NW8, SW1A, SW1E, SW1H, SW1P, SW1V, SW1W, SW1X.